Frequently Asked Questions
What people ask about choosing panels, standards, quotes, manufacturing and installation.
General
First we learn about your needs and the project location by phone, WhatsApp or the contact form. We then carry out a site survey to review the existing installation, supply point, loads, installation location and ambient conditions. Based on the survey and your electrical project, if there is one, we prepare the single-line diagram and layout drawing of the panel and present them together with the quote. Scheduling and terms of the survey are communicated in the first conversation, depending on the scope and location of the job.
We design and manufacture our panels specifically for each project. Even two panels with the same name may be designed differently depending on the connected loads, short-circuit level, installation location, ambient conditions and how the user operates the site. Enclosure size, IP protection rating, protective and control devices, metering instruments and automation requirements are decided together after the survey. This approach prevents a panel from being oversized or undersized and allows future expansion to be taken into account.
We manufacture our panels in line with IEC 61439-1 and IEC 61439-2, which cover low-voltage switchgear and controlgear assemblies. IEC 61439 focuses on verifying the design and manufacture of the panel as a whole, not just the components inside it, and covers topics such as temperature rise, short-circuit withstand, insulation and protection. We run our production processes within an ISO 9001:2015 quality management system and continuously improve them based on customer feedback.
Our office is in Ortaca. We work across Muğla, particularly in Ortaca, Dalyan, Dalaman and Köyceğiz, as well as Fethiye, Marmaris, Bodrum, Milas and Menteşe. We have also manufactured and installed panels for hotels, schools, healthcare buildings, industrial facilities and residential projects in provinces such as Aydın and İzmir. Work in more distant areas is planned according to the project schedule; simply tell us the project location in the first conversation.
Yes. Panels are checked before dispatch, and on-site installation, cable connections, testing and commissioning are carried out by our team. Commissioning includes testing PLC software together with the field equipment in automation panels, setting up the steps in power factor correction panels and testing changeover scenarios in generator transfer panels. On handover, the operation of the panel is explained to the responsible people.
You can contact us by phone, WhatsApp, e-mail or the quote form on our website. The project location, the type of panel you need, your electrical project or single-line diagram if available, and photos of the existing panel and installation location all speed up the quotation process. If the information is sufficient we make a preliminary assessment, and plan a site survey if needed. Price and lead time are confirmed in a written quote after the survey and design, depending on the scope of the project.
Power Distribution Panels
Inductive loads such as motors, air conditioners, pumps, compressors and ballasts draw reactive power in addition to the active power that does useful work. When reactive power consumption exceeds certain limits, it may appear on the electricity bill as a reactive energy charge. A power factor correction panel balances this consumption by automatically switching capacitor steps in and out with the help of a reactive power controller. It is usually necessary for businesses, hotels, workshops and industrial sites with a high inductive load; we determine the need and the right capacity by reviewing your bills and load profile.
An LV (low-voltage) distribution panel distributes power safely to different parts of a building or site and protects each outgoing circuit with suitable protective devices. A metering panel houses the meters that measure energy consumption, arranged according to the distribution company’s rules. In apartment buildings and housing complexes, the main distribution panel, metering panels and apartment or floor panels are usually planned together. Transformer panels form the section where power from the transformer substation is first received and passed on to distribution.
Yes. Common problems with old panels include insufficient capacity, outdated protective devices, untidy wiring and loads added without planning. During the survey we review the existing panel and connected loads and decide together whether extending or replacing it is the better option. For renewal work we plan ahead to keep the time without power to a minimum; this duration is communicated after the survey, depending on the scope of the work.
Automation and Control Panels
Conventional control panels build fixed operating logic with devices such as contactors, relays and timers; changing the logic requires rewiring. In a PLC automation panel, the operating logic is defined in software. Functions such as sequencing, timing, level and temperature control can therefore be set up more flexibly, changed later and monitored via an operator panel. A control panel may be enough for starting a single motor; for processes in which several pieces of equipment work together, a PLC is more suitable.
Pump panels are built to run irrigation, booster, well and tank pumps safely. Depending on the pump rating and how it is used, devices such as a motor protection circuit breaker or thermal overload relay, phase sequence and phase loss protection, dry-run protection and level control are used. For high-power pumps the starting method is also assessed separately. Depending on requirements, features such as time programmes, remote start or sequential operation of several pumps with a PLC can be added.
Yes. As Aynalı PLC Otomasyon, we work in PLC and automation software as well as panel manufacturing. We define with you how the process should work, prepare the software accordingly and commission it after testing with the equipment on site. For machine supply and control panels, we also handle the design in-house so that the software and hardware fit together.
Solar, Generator and Smart Systems
A generator transfer panel continuously monitors the mains supply. When the mains fails or the voltage goes outside acceptable limits, it sends a start command to the generator and transfers the load once the generator is ready. When the mains returns and remains stable for a set time, the load is transferred back to the mains and the generator is stopped after its cool-down period. Interlocking is used during changeover so that mains and generator are never connected to the load at the same time. It is an important solution for hotels, hospitals, schools and businesses where an outage would cause losses.
In solar energy systems, panels are usually considered on two sides. On the DC side there are string fuses for the strings coming from the solar modules, DC disconnectors and surge protection devices. On the AC side, from the inverter output to the grid or point of consumption, there are circuit breakers, residual current protection, surge protection and, where needed, metering devices. Components are selected according to the system’s power, string layout, inverter type and the ambient conditions at the installation location.